2025 03 29 - Wardrobe leg cutting

2025 03 29 - Wardrobe leg cutting

HOME
Day 335: On March 29th of the home improvement project the wardrobe was moved into the newly carpeted basement family room. I had to cut the legs shorter for it to fit where we wanted it to be. The unlevel concrete floor under the carpet made this a challenge. I had to take careful measurements from the ceiling to the carpet because each leg was slightly different with almost 3/4 of an inch variance between legs. I must have done it correctly because the top of the wardrobe looks level with the ceiling.

With the wardrobe in its correct place I can now access my workbench again and also get into the refrigerator and freezer that were blocked. Next up is moving everything from the sunroom into the basement.

#ALT_TXT#
2025_03_29_-_Wardrobe_leg_cutting-1280x720v30.mp4
54.35 MB
#ALT_TXT#
IMG_2025_03_29_-_Wardrobe_leg_cutting-f003679.png
1018.25 KB
#ALT_TXT#
IMG_2025_03_29_-_Wardrobe_leg_cutting-f003913.png
1.09 MB
#ALT_TXT#
IMG_2025_03_29_-_Wardrobe_leg_cutting-f004140.png
1.06 MB
#ALT_TXT#
IMG_2025_03_29_-_Wardrobe_leg_cutting-f006430.png
1.09 MB
#ALT_TXT#
IMG_2025_03_29_-_Wardrobe_leg_cutting-f008116.png
1.05 MB
#ALT_TXT#
IMG_2025_03_29_-_Wardrobe_leg_cutting-f008498.png
1.03 MB
#ALT_TXT#
IMG_2025_03_29_-_Wardrobe_leg_cutting-f008886.png
1.01 MB
#ALT_TXT#
IMG_20250329_125225158.jpg
1.72 MB
#ALT_TXT#
IMG_20250329_125244518.jpg
1.85 MB
#ALT_TXT#
IMG_20250329_203456451.jpg
1.66 MB

HOME

Created by IrfanView