2010 07 24 - Basement bathroom project - Day 3

2010 07 24 - Basement bathroom project - Day 3

HOME
This was a very long day. It ended about 3:00 AM Sunday morning, July 25th. Lots of sweating pipes. The last thing we did was cut into the main water supply for cold and also into the hot water line. The main valve to the house doesn't drip, but it also doesn't shut off completely. I actually taught Chris a trick to get around this problem. If there is water in a pipe there is no way to get it hot enough to solder. The trick I learned somewhere is to shove some white bread into the pipe. That blocks the water long enough to solder the joint. Once pressure is restored the break just busts up and flushes through. We were able to use that trick and get the fittings all done. When pressure was restored there was only one leak. It was a fitting that hadn't been soldered yet. That was taken care of in short order and then everything was nice and tight. Chris does good work.
#ALT_TXT#
IMG_9313.JPG
3.34 MB
#ALT_TXT#
IMG_9314.JPG
2.71 MB
#ALT_TXT#
IMG_9317.JPG
3.07 MB
#ALT_TXT#
IMG_9318.JPG
2.82 MB
#ALT_TXT#
IMG_9319.JPG
3.25 MB
#ALT_TXT#
IMG_9320.JPG
3.04 MB
#ALT_TXT#
IMG_9321.JPG
3.35 MB
#ALT_TXT#
IMG_9322.JPG
2.78 MB
#ALT_TXT#
IMG_9323.JPG
2.34 MB
#ALT_TXT#
IMG_9324.JPG
2.76 MB
#ALT_TXT#
IMG_9325.JPG
3.15 MB
#ALT_TXT#
IMG_9326.JPG
2.89 MB
#ALT_TXT#
IMG_9327.JPG
3.06 MB
#ALT_TXT#
IMG_9328.JPG
2.95 MB
#ALT_TXT#
IMG_9329.JPG
2.92 MB

HOME

Created by IrfanView