The big question always in my mind as I started the design process was
where was our property line and where were the set backs? Would the
design even fit within the set backs? I finally simply had to know so I
contacted TAJ Engineering out of Lowell, MA on Oct 29, 2022. I hired them
to make a certified plot plan of our property for $3k. It took until Dec
16, 2022 to finally get the plot plan. Once I had it I incorporated the
plan into my design software and finally knew for certain that my design
would fit within the set backs. The back right corner of the garage is
the determining point. It needs to be at least 10 feet from the property
line. My design gives 11 feet just to have some margin. The image
showing the design on the plot plan is a from earlier design 36, but
it is very close to the final. The other images are from the City of
Nashua's GIS portal and some older documents I got somewhere long ago.
|