Day 8: The storage needs a partial clean out to provide space for HVAC work. The AC condenser and the furnace exhaust/air supply need to be moved to make room for a new bulkhead door. The top shelves need to be cleared to provide access. Also, everything on the floor in the storage area needs to be cleared out so HVAC guys have room to work. The clean out was done today. |
2024_05_06_-_Clearing_storage_area-1280x720-v30.mp4 43.92 MB |