Day 9: Freedom Corp HVAC is the subcontractor on the job. They came on site today to move the AC condenser and the furnace exhaust/air supply. These need to be moved to make way for the new bulkhead door. The existing bulkhead door will be covered up by the addition. It will become the access point to the crawl space. |