2024 06 18 - Lumber delivery - Framing prep work

2024 06 18 - Lumber delivery - Framing prep work

HOME
Day 51: The first lumber dropped occurred today. That forklift is an amazing tool. I didn't know they could go sideways! It makes sense though when you consider how long some of those beams that they deliver can be. After lumber was dropped then Rich and Dillon did some prep work for the framing.

There are two time lapse videos again. The South Camera also has some cell phone video at the beginning showing the forklift in action.

#ALT_TXT#
2024_06_18_-_Lumber_delivery-Framing_prep_work-North_Camera-1280x720v30.mp4
85.81 MB
#ALT_TXT#
2024_06_18_-_Lumber_delivery-Framing_prep_work-South_Camera-1280x720v30.mp4
208.36 MB
#ALT_TXT#
IMG_20240618_080925211.jpg
3.74 MB
#ALT_TXT#
IMG_20240618_080928202_HDR.jpg
2.98 MB
#ALT_TXT#
IMG_20240618_080930870_HDR.jpg
3.40 MB
#ALT_TXT#
VID_20240618_081520123.mp4
3891.74 MB
#ALT_TXT#
VID_20240618_081520123_02.mp4
502.18 MB
#ALT_TXT#
VID_20240618_082010795.mp4
234.51 MB

HOME

Created by IrfanView