2024 07 01 - Framing - Day 1

2024 07 01 - Framing - Day 1

HOME
Day 64 since contract signing. Today the framing started. Before the framing crew arrived Rich and Dillon did some prep work removing the side kitchen window and a bunch of siding. The crew arrived about 11:30 AM and worked until 5:30 PM. In that time they were able to get all the floor joists installed and the decking.

The framing is being done by Travis and his crew from T C Construction & Home Improvements LLC

The South Camera has the best video.

#ALT_TXT#
2024_07_01_-_Framing-Day_1-North_Camera-1280x720v30.mp4
265.66 MB
#ALT_TXT#
2024_07_01_-_Framing-Day_1-South_Camera-1280x720v30.mp4
523.81 MB
#ALT_TXT#
IMG_20240701_115009401.jpg
4.05 MB
#ALT_TXT#
IMG_20240701_184317980.jpg
2.93 MB
#ALT_TXT#
IMG_20240701_184344135.jpg
3.89 MB
#ALT_TXT#
IMG_20240701_184348240.jpg
4.20 MB
#ALT_TXT#
IMG_20240701_184411027.jpg
3.78 MB
#ALT_TXT#
IMG_20240701_184428530.jpg
3.74 MB
#ALT_TXT#
IMG_20240701_184441440.jpg
4.00 MB
#ALT_TXT#
IMG_20240701_184507641.jpg
3.31 MB
#ALT_TXT#
IMG_20240701_184523234.jpg
3.97 MB
#ALT_TXT#
VID_20240701_145332488.mp4
3891.78 MB
#ALT_TXT#
VID_20240701_145332488_02.mp4
3891.12 MB
#ALT_TXT#
VID_20240701_145332488_03.mp4
3891.11 MB
#ALT_TXT#
VID_20240701_145332488_04.mp4
777.42 MB
#ALT_TXT#
VID_20240701_162112496.mp4
537.21 MB
#ALT_TXT#
VID_20240701_162530650.mp4
3891.78 MB
#ALT_TXT#
VID_20240701_162530650_02.mp4
2422.95 MB

HOME

Created by IrfanView