2024 07 08 - Framing - Day 4

2024 07 08 - Framing - Day 4

HOME
Day 71: This is Day 71 of the project and the 4th day of framing. They finished all the walls and got all the ceiling joists in place. In order to do that there were several LVL beams that had to be installed. The biggest one has an 18 foot span. It is almost 23 inches thick. The North Camera has the best view of that beam being installed.

As usual there are two time lapse videos from the North and South Cameras. At the bottom of the page is a walk through video capturing the progress made today.

#ALT_TXT#
2024_07_08_-_Framing-Day_4-North_Camera-1280x720v30.mp4
310.90 MB
#ALT_TXT#
2024_07_08_-_Framing-Day_4-South_Camera-1280x720v30.mp4
523.18 MB
#ALT_TXT#
IMG_20240708_080043536_HDR.jpg
3.80 MB
#ALT_TXT#
IMG_20240708_080048471_HDR.jpg
3.79 MB
#ALT_TXT#
IMG_20240708_080113036_HDR.jpg
3.63 MB
#ALT_TXT#
IMG_20240708_080158571_HDR.jpg
3.72 MB
#ALT_TXT#
IMG_20240708_115047421.jpg
4.19 MB
#ALT_TXT#
IMG_20240708_115104659.jpg
4.20 MB
#ALT_TXT#
IMG_20240708_115158416.jpg
2.99 MB
#ALT_TXT#
IMG_20240708_115212508.jpg
2.86 MB
#ALT_TXT#
IMG_20240708_115216461.jpg
2.74 MB
#ALT_TXT#
IMG_20240708_141848839.jpg
3.71 MB
#ALT_TXT#
IMG_20240708_141902032.jpg
4.16 MB
#ALT_TXT#
IMG_20240708_155418649_HDR.jpg
5.46 MB
#ALT_TXT#
IMG_20240708_174214230.jpg
3.20 MB
#ALT_TXT#
IMG_20240708_174240247.jpg
3.38 MB
#ALT_TXT#
IMG_20240708_174255749.jpg
2.53 MB
#ALT_TXT#
IMG_20240708_174258931.jpg
2.59 MB
#ALT_TXT#
IMG_20240708_174304308.jpg
2.77 MB
#ALT_TXT#
IMG_20240708_174308818.jpg
2.66 MB
#ALT_TXT#
IMG_20240708_174312873.jpg
2.45 MB
#ALT_TXT#
IMG_20240708_174320210.jpg
2.37 MB
#ALT_TXT#
IMG_20240708_174330230.jpg
3.17 MB
#ALT_TXT#
IMG_20240708_174332746.jpg
2.76 MB
#ALT_TXT#
VID_20240708_155500435.mp4
1859.63 MB
#ALT_TXT#
VID_20240708_160813098.mp4
723.77 MB
#ALT_TXT#
VID_20240708_174359376.mp4
1213.06 MB

HOME

Created by IrfanView