2024 07 10 - Kitchen demolition continued

2024 07 10 - Kitchen demolition continued

HOME
Day 73. Today most of the kitchen demolition was completed. The plumbers came and sealed the water lines that were going into the kitchen. They also removed the cast iron vent pipe going through the roof. They temporarily put in a vent in the hallway closet. Eventually that will go out the roof, but in a different place.

Once the plumbing work was done then Rich was able to remove the remaining kitchen cabinets. We saved that faucet. Fortunately I had kept the installation tool from 2013 when I installed the faucet. It was in a bag with all my plumbing supplies. It only took me 2 minutes to find it. The plumbers used that to remove the faucet.

#ALT_TXT#
2024_07_10_-_Kitchen_demolition_continued-1280x720v30.mp4
49.98 MB
#ALT_TXT#
IMG_20240710_090423993.jpg
1.75 MB
#ALT_TXT#
IMG_20240710_090938479.jpg
2.35 MB
#ALT_TXT#
VID_20240710_085358478.mp4
146.10 MB
#ALT_TXT#
VID_20240710_092046620.mp4
2426.83 MB

HOME

Created by IrfanView