2024 07 20 - Framing - Day 14

2024 07 20 - Framing - Day 14

HOME
Day 83: The framing crew worked on a Saturday trying to get things wrapped up. They built the front porch and its roof. Unfortunately there are problems. The 12 foot LVL beam across the front of the porch is too low. It's so low that a storm door on the front door won't be able to open. Also, they deviated from the build prints and put in 4 columns across the porch. These problems were reported, but Rich already had a fix in the works. The problems all got resolved on July 22nd.

#ALT_TXT#
2024_07_20_-_Framing-Day_14-Building_front_porch-1280x720v30.mp4
286.12 MB
#ALT_TXT#
2024_07_20_-_Framing-Day_14-Interior_work-1280x720v30.mp4
33.67 MB
#ALT_TXT#
2024_07_20_-_Framing-Day_14-South_Camera-1280x720v30.mp4
419.70 MB
#ALT_TXT#
IMG_20240720_073305373.jpg
3.49 MB
#ALT_TXT#
IMG_20240720_073326946_HDR.jpg
3.87 MB
#ALT_TXT#
IMG_20240720_073358055.jpg
3.10 MB
#ALT_TXT#
IMG_20240720_073436237.jpg
3.63 MB
#ALT_TXT#
IMG_20240720_100701285.jpg
3.93 MB
#ALT_TXT#
IMG_20240722_090837275.jpg
3.89 MB
#ALT_TXT#
VID_20240720_100625801.mp4
3892.01 MB
#ALT_TXT#
VID_20240720_100625801_02.mp4
3891.69 MB
#ALT_TXT#
VID_20240720_100625801_03.mp4
3891.98 MB
#ALT_TXT#
VID_20240720_100625801_04.mp4
3891.54 MB
#ALT_TXT#
VID_20240720_100625801_05.mp4
2397.99 MB
#ALT_TXT#
VID_20240720_130158383.mp4
2083.20 MB
#ALT_TXT#
VID_20240720_132419935.mp4
3891.99 MB
#ALT_TXT#
VID_20240720_132419935_02.mp4
3891.75 MB
#ALT_TXT#
VID_20240720_132419935_03.mp4
3891.42 MB
#ALT_TXT#
VID_20240720_132419935_04.mp4
627.79 MB
#ALT_TXT#
VID_20240720_152428103.mp4
3892.00 MB
#ALT_TXT#
VID_20240720_152428103_02.mp4
2039.14 MB

HOME

Created by IrfanView