Day 88: Roofing continued with the west side. Rich reworked the front porch roof a little
by removing an overhang that would have been impossible to roof. The chimney repair concluded
on the outside and the staging was removed. Franz the mason then moved inside the living
room and fixed cracks and loose bricks there. The ivy fell down on the outside yesterday so
it was trimmed back quite low. It will grow back, but we need to make sure it stays off the
side of the house and only stays on the bricks. The South Camera is where all the action took place. The North Camera mostly just shows bobbing heads up and down. |