2024 07 26 - Roofing completed

2024 07 26 - Roofing completed

HOME
Day 89: The roof is almost done! The south side of the living room was done and the small west peak of the north side. The north side of the sun room was done. The continuous roof vent still needs to be cut and shingles put in to cover that vent. Also the shed roof still needs to be replaced. However, the roof on the house is now water tight!

I made four time lapse videos this time, the regular North and South Cameras, and two from cell phone camera to provide better detail of the job.

The still pictures were taken late afternoon. No more tarps! The picture taken from the back makes the roof look blue, but that was the sunlight messing with the camera. It doesn't look blue in real life.

#ALT_TXT#
2024_07_26_-_Roofing_completed-North_Camera-1280x720v30.mp4
282.15 MB
#ALT_TXT#
2024_07_26_-_Roofing_completed-North_sunroom_gable-1280x720v30.mp4
90.01 MB
#ALT_TXT#
2024_07_26_-_Roofing_completed-South_Camera-1280x720v30.mp4
255.66 MB
#ALT_TXT#
2024_07_26_-_Roofing_completed-South_gable-1280x720v30.mp4
189.41 MB
#ALT_TXT#
IMG_20240726_185129886.jpg
3.85 MB
#ALT_TXT#
IMG_20240726_185347981.jpg
4.42 MB
#ALT_TXT#
VID_20240726_083158696.mp4
3892.02 MB
#ALT_TXT#
VID_20240726_083158696_02.mp4
3683.66 MB
#ALT_TXT#
VID_20240726_094558292.mp4
3891.83 MB
#ALT_TXT#
VID_20240726_094558292_02.mp4
3891.64 MB
#ALT_TXT#
VID_20240726_094558292_03.mp4
2407.29 MB
#ALT_TXT#
VID_20240726_121715984.mp4
3891.98 MB
#ALT_TXT#
VID_20240726_121715984_02.mp4
3891.58 MB
#ALT_TXT#
VID_20240726_121715984_03.mp4
3891.45 MB
#ALT_TXT#
VID_20240726_121715984_04.mp4
1869.78 MB

HOME

Created by IrfanView