2024 08 06 - Living room framing - Rough in plumbing-Day 2

2024 08 06 - Living room framing - Rough in plumbing-Day 2

HOME
Day 100: One hundred days since contract signing. Framing continued in the living room finishing up a few areas. The rough in framing was done for the side window that looks out over the porch. A lot more work was done demolishing the bathroom.

#ALT_TXT#
2024_08_06_-_Living_room_framing-Rough_in_plumbing-Day_2-1280x720v30.mp4
140.74 MB
#ALT_TXT#
VID_20240806_134138801.mp4
70.49 MB
#ALT_TXT#
VID_20240806_134325240.mp4
191.81 MB
#ALT_TXT#
VID_20240806_134549425.mp4
1638.75 MB