Day 107: Phil did more foam board installation. Rich arrived with the narrower side
window and he and Phil installed that. Plywood was installed on the bathroom floor and
framing of the new wall layout and closet was done. |
2024_08_13_-_Bathroom_framing-1280x720v30.mp4 95.31 MB |
2024_08_13_-_Foam_board_install-Side_window_install-1280x720v30.mp4 78.07 MB |