Day 123: Siding was installed to the left of the chimney. This is where all the utility
boxes are for telephone, Comcast, emergency generator, and electrical power; king of a messy
wall section. Rich and Kevin put siding on the edge of the porch roof, another tight spot
to work in. Kevin installed a bunch of 2x4 pieces in the eaves around the back of the house
getting to ready for siding next week. It's Labor Day weekend so no work will be done until September 3rd. It's a welcome break from all the daily activity. |
2024_08_29_-_Siding_left_of_chimney-Siding_prep-1280x720v30.mp4 220.47 MB |
IMG_20240829_132335417.jpg 4.25 MB |
IMG_20240829_132400464.jpg 3.99 MB |
IMG_20240829_132437048.jpg 3.94 MB |