Day 128: After the long Labor Day weekend work resumed. Rich and Kevin finished
siding the long garage wall and moved onto the back wall. They finished that
wall and mostly finished the south wall of the sun room. The electricians
continued inside. |
2024_09_03_-_Siding_back_wall_and_sun_room-1280x720v30.mp4 326.54 MB |
siding_back_wall.jpg 706.26 KB |