2024 09 19 - Drywall install - Electrical

2024 09 19 - Drywall install - Electrical

HOME
Day 144: Today is Sept 19th of the home renovation project. Drywall installation started today. The crew of two worked very fast. With one on stilts and the other on a ladder they lift those 16 foot lengths of drywall up 9 1/2 feet to the ceiling and screw them in place. It was really something to see, and you can in the time lapse video. The electricians were also here today working on the power meter box on the outside and the new breaker box in the basement.

#ALT_TXT#
2024_09_19_-_Drywall_install-1280x720v30.mp4
67.05 MB
#ALT_TXT#
2024_09_19_-_Electrical-1280x720v30.mp4
109.22 MB
#ALT_TXT#
IMG-2024_09_19_-_Drywall_install-f007318.png
1.08 MB
#ALT_TXT#
IMG-2024_09_19_-_Drywall_install-f009422.png
929.27 KB
#ALT_TXT#
IMG-2024_09_19_-_Electrical-f004481.png
1.51 MB
#ALT_TXT#
IMG-2024_09_19_-_Electrical-f007742.png
1.28 MB
#ALT_TXT#
VID_20240919_090200742.mp4
1835.16 MB
#ALT_TXT#
VID_20240919_092514853.mp4
849.05 MB
#ALT_TXT#
VID_20240919_093412256.mp4
208.00 MB
#ALT_TXT#
VID_20240919_093627471.mp4
483.16 MB
#ALT_TXT#
VID_20240919_094119191.mp4
728.15 MB
#ALT_TXT#
VID_20240919_094923498.mp4
1568.44 MB
#ALT_TXT#
VID_20240919_100447133.mp4
706.23 MB
#ALT_TXT#
VID_20240919_114222781.mp4
1482.56 MB
#ALT_TXT#
VID_20240919_115831050.mp4
255.11 MB
#ALT_TXT#
VID_20240919_120353184.mp4
165.02 MB
#ALT_TXT#
VID_20240919_120600538.mp4
328.82 MB
#ALT_TXT#
VID_20240919_140205009.mp4
744.85 MB
#ALT_TXT#
VID_20240919_140928989.mp4
409.42 MB
#ALT_TXT#
VID_20240919_141420519.mp4
342.26 MB
#ALT_TXT#
VID_20240919_141818920.mp4
1126.78 MB
#ALT_TXT#
VID_20240919_142926761.mp4
671.77 MB
#ALT_TXT#
VID_20240919_143604479.mp4
968.09 MB
#ALT_TXT#
VID_20240919_144534455.mp4
509.05 MB
#ALT_TXT#
VID_20240919_145054746.mp4
21.09 MB
#ALT_TXT#
VID_20240919_145121197.mp4
346.10 MB

HOME

Created by IrfanView