Day 155: On Sept 30th of the home renovation project the drywall
mudding crew sanded all the mudded surfaces.
The level of dust created was incredible. It hung in the air like
fog. The crew wore respirators the whole time. I held my breath
when walking through the house to the outside. Cleanup took many
hours. The dust got everywhere. |