Day 159: On Oct 4th of the home renovation project about 2/3 of
the kitchen cabinets were installed! Rich and Phil did excellent
and careful work making sure everything is level and plumb. One
more day will finish the cabinet installation. Kevin started isntalling the shims in the windows preparatory to installing the trim. Each window has to be measured at 8 points and custom shims cut and installed so that the trim lines up with the frame of the window. It is slow work and requires careful attention to detail. |