2024 10 21 - Old attic floor installed

2024 10 21 - Old attic floor installed

HOME
Day 176: On Oct 21st of the home renovation project I finished putting the floor back in the old attic. Early in the project I had to remove everything from the attic including the floor. The new roof line has taken half the attic away, but the project has provided a large crawl space storage area and new attic storage above the garage and kitchen. The old attic is for Joyce's "stash", and she has a lot! I was able to cover up almost all the wiring and spray foam insulation. I had to work around the new vent pipe, but all in all it is very usable storage for Joyce to have above her Room of Requirement.

Today Rich, Phil and Kevin did lots of smaller tasks getting ready to install the floor. The electricians all came in the afternoon finishing up some odds and ends such as making the doorbell work (ding dong!)

#ALT_TXT#
IMG_20241022_073847611.jpg
3.57 MB
#ALT_TXT#
IMG_20241022_073902235.jpg
2.10 MB
#ALT_TXT#
IMG_20241022_073942340_HDR.jpg
3.51 MB
#ALT_TXT#
IMG_20241022_073955048.jpg
1.92 MB
#ALT_TXT#
IMG_20241022_074024730.jpg
2.01 MB
#ALT_TXT#
IMG_20241022_074052402.jpg
2.23 MB
#ALT_TXT#
IMG_20241022_074120007.jpg
2.30 MB
#ALT_TXT#
IMG_20241022_074138149.jpg
1.88 MB
#ALT_TXT#
IMG_20241022_081327620.jpg
5.80 MB

HOME

Created by IrfanView