2024 10 28 - Flooring - Railings - Leaf guards

2024 10 28 - Flooring - Railings - Leaf guards

HOME
Day 183: It's Oct 28th of the home renovation project. There were 7 extra people in our house today working on Ethernet wiring, stair railing fabrication, floor installation, baseboard installation, and gutter leaf guard installation. It was a busy day. I accidentally erased all the time lapse video of flooring and railing fabrication. I took some still pictures. The open rail posts are in place. The hand rail has been carefully crafted and the glue needs to dry overnight. That will all be put together tomorrow. All the flooring is done except for our bedroom because we're still using it. We'll be moving out of that soon. So much good progress!

#ALT_TXT#
2024_10_28_-_Leaf_guards-1280x720v30.mp4
132.77 MB
#ALT_TXT#
IMG_20241028_165510550.jpg
2.25 MB
#ALT_TXT#
IMG_20241028_165524623.jpg
2.64 MB
#ALT_TXT#
IMG_20241028_165621113.jpg
2.21 MB
#ALT_TXT#
IMG_20241028_165636975.jpg
1.22 MB
#ALT_TXT#
IMG_20241028_165658193.jpg
2.64 MB
#ALT_TXT#
IMG_20241028_165709353.jpg
2.71 MB
#ALT_TXT#
IMG_20241028_165802000.jpg
2.60 MB
#ALT_TXT#
IMG_20241028_165810412.jpg
3.36 MB
#ALT_TXT#
IMG_20241028_165822951.jpg
3.12 MB
#ALT_TXT#
IMG_20241028_173224375.jpg
1.19 MB
#ALT_TXT#
IMG_20241028_173248627.jpg
2.40 MB
#ALT_TXT#
IMG_20241028_173318276.jpg
1.68 MB
#ALT_TXT#
IMG_20241028_173459766.jpg
2.02 MB
#ALT_TXT#
IMG_20241028_173627270.jpg
1.54 MB
#ALT_TXT#
IMG_20241028_181916509.jpg
1.78 MB
#ALT_TXT#
IMG_20241028_181938160.jpg
1.54 MB
#ALT_TXT#
VID_20241028_102027912.mp4
2749.70 MB
#ALT_TXT#
VID_20241028_104812011.mp4
1958.39 MB
#ALT_TXT#
VID_20241028_110727224.mp4
1758.85 MB
#ALT_TXT#
VID_20241028_112452093.mp4
1561.93 MB
#ALT_TXT#
VID_20241028_114127597.mp4
3891.98 MB
#ALT_TXT#
VID_20241028_114127597_02.mp4
1177.04 MB
#ALT_TXT#
VID_20241028_123210072.mp4
3891.99 MB
#ALT_TXT#
VID_20241028_123210072_02.mp4
518.22 MB

HOME

Created by IrfanView