2024 11 08 - Painting - Start microwave install

2024 11 08 - Painting - Start microwave install

HOME
Day 194: On Nov 8th of the home improvement project doors were rehung and there was a lot of painting. The new microwave was taken out of the box. It turns out that some duct work needs to be done before it can be installed. The wall was set up for venting at the bottom. The microwave vents at the top. Oops. I cleane up the kitchen faucet from the old kitchen and used some metal polish to spiff it up. It looks almost new. Plumbing will happen next week.

Rich said Joyce can start setting up things in the new kitchen. I've been given the green light to mount the TV in the living room. I'll start pulling stuff out of the POD and putting it where it belongs. Wow!

#ALT_TXT#
2024_11_08_-_Painting-Start_microwave_install-1280x720v30.mp4
85.68 MB
#ALT_TXT#
IMG_2024_11_08_-_Painting-Start_microwave_install-f000927.png
1.05 MB
#ALT_TXT#
IMG_2024_11_08_-_Painting-Start_microwave_install-f005665.png
842.03 KB
#ALT_TXT#
IMG_2024_11_08_-_Painting-Start_microwave_install-f010122.png
634.24 KB
#ALT_TXT#
IMG_2024_11_08_-_Painting-Start_microwave_install-f016197.png
888.26 KB
#ALT_TXT#
IMG_20241107_160010093.jpg
2.61 MB
#ALT_TXT#
IMG_20241107_160017166.jpg
1.64 MB
#ALT_TXT#
IMG_20241107_160025626.jpg
2.06 MB
#ALT_TXT#
IMG_20241107_160043367.jpg
1.76 MB
#ALT_TXT#
IMG_20241108_153726741.jpg
1.90 MB
#ALT_TXT#
VID_20241108_083330945.mp4
47.97 MB
#ALT_TXT#
VID_20241108_083648620.mp4
247.86 MB
#ALT_TXT#
VID_20241108_083919769.mp4
751.46 MB

HOME

Created by IrfanView