2024 11 11 - Microwave install - Painting Doors

2024 11 11 - Microwave install - Painting Doors

HOME
Day 197: Today is Nov 11th (Veterans Day) of the home improvement project. The microwave was installed and the gas range was brought up from the POD and put in its place in the kitchen. Final hookup will be later. Rich and Kevin did lots of painting. Our 55" flat panel TV was also freed from its confinement in the POD and brought into the house. I installed the wall mount in its new location and got it all hooked up and running. The living room will be turned over to us tomorrow!

#ALT_TXT#
2024_11_11_-_Microwave_and_range_install-Painting-Doors-1280x720v30.mp4
116.00 MB
#ALT_TXT#
IMG_2024_11_11_-_Microwave_install-Painting-Doors-f001709.png
933.64 KB
#ALT_TXT#
IMG_2024_11_11_-_Microwave_install-Painting-Doors-f006953.png
980.92 KB
#ALT_TXT#
IMG_2024_11_11_-_Microwave_install-Painting-Doors-f011639.png
820.52 KB
#ALT_TXT#
IMG_2024_11_11_-_Microwave_install-Painting-Doors-f016212.png
996.42 KB
#ALT_TXT#
IMG_2024_11_11_-_Microwave_install-Painting-Doors-f016305.png
952.10 KB
#ALT_TXT#
IMG_20241112_112638213.jpg
2.28 MB

HOME

Created by IrfanView