2024 11 12 - Bedroom floor - Toe kick - Painting - Start tiled shower

2024 11 12 - Bedroom floor - Toe kick - Painting - Start tiled shower

HOME
Day 198: On Nov 12th of the home improvement project Rich and Phil installed the floor in the last bedroom. Kevin painted doors and trim all over the house. Once the floor was done Rich and Phil installed cement board in the shower getting ready for tile. Unfortunately my time lapse camera didn't run and I missed all that. I only have before and after pictures.

All the construction stuff that was stored in the living room has been cleaned up. We could put the couch back in the living room, but unfortunately it is buried half way back in the POD. I'll get access to it this weekend once we can move back into our bedroom. Progress!

#ALT_TXT#
2024_11_12_-_Bedroom_floor_installed-1280x720v30.mp4
45.67 MB
#ALT_TXT#
2024_11_12_-_Painting_Doors_and_toe_kicks-1280x720v30.mp4
46.28 MB
#ALT_TXT#
IMG_2024_11_11_-_Painting_Doors-f000282.png
843.42 KB
#ALT_TXT#
IMG_2024_11_11_-_Painting_Doors-f007064.png
790.63 KB
#ALT_TXT#
IMG_2024_11_11_-_Painting_Doors-f007775.png
740.12 KB
#ALT_TXT#
IMG_2024_11_12_-_Bedroom_floor_installed-f000304.png
809.27 KB
#ALT_TXT#
IMG_2024_11_12_-_Bedroom_floor_installed-f003630.png
800.30 KB
#ALT_TXT#
IMG_2024_11_12_-_Bedroom_floor_installed-f005983.png
788.14 KB
#ALT_TXT#
IMG_TLC00001-f000260.png
829.84 KB
#ALT_TXT#
IMG_TLC00004-f000016.png
903.87 KB

HOME

Created by IrfanView